

The extreme park concept was developed with the involvement of the local sports community. The site is divided into training spaces for the new Olympic extreme sports disciplines – skateboarding and BMX.
The project was done together with our partner, FK Ramps. We have covered the planning of a large-scale pump track made of asphalt. It covers 1400m2, the track is 170 meters long and consists of various waves and jumps. A feature of the pumping space in Ivanovo was the presence of an Airline in the form of jumps of different heights for performing amplitude tricks. The fly section is located on a branch from the main trajectory, there are figures for departures and transfers. The sports park has a recreation area for athletes and powerful lighting for training in the evening.